Jones C.R. E. No. 24.
Kowloon Canton Railway.
BRITISH SECTION.
ESTIMATE.
Main Head.
Bridges.
Sub. Head
Hinor Bridge No.11.
*
Two 3 ft 8in Culverts at ch.27*550 Drawing C.R.E. No.111*
B2.
Work
Quantity DESCRIPTION Rate Unit Amount 9,700 Excavation in foundations, 10/ Cts. 97 Timbering and pumping 7,300 Concrete in foundations, 11,800 Masonry in Superstructure. 38/ 300 Masonry in coping. 880 Dry stone pitching. 2/- 10/ xxx 2,555 4,600 120 Total 7,677 80 Contingencies 10% 767 78 Grand Total 8,445 58.CBWliBЯ notne noolwo
notnað
MOITO3a HerrISIA
2TAMIYAT
Y
..
1
01 zolɔniqni1000
Jones C.R. E. No. 24.
Kowloon Canton Railway.
BRITISH SECTION.
ESTIMATE.
110
brott nick
Main Head.
Bridges.
DESH AM
Sub. Head
Hinor Bridge Ho.11.
*
Two 3 ft 8lab Culverts at ch.27*550 Drawing C.R.E. No.111*
B2.
Work
AMOUNT.
Quantity.
DESCRIPTION.
Rate.
Unit.
必
Cts.
9,700
Recavation in foundations,
10/
97
A
30:00
Item Timbering and pumping
7,300 Concrete in foundations,
11,800 Mponry in Superstructure.
300
38/
is
60 Masonry in coping.
880 Dry stone pitching.
2/-
10/
xxx
2,555
4,600
120
キョンT
Total
7,677 80
Contingincies 10%
767
78
IeloT breD
Grand Total
8,445
58
8 8 8 8 8 8
نه او به